Archive for the ‘Uncategorized’ Category

Northwest Ohio Psychiatric Hospital Exterior Repairs

Tuesday, September 21st, 2010

Owner

Ohio Department of Mental Health
Capital Planning and Management Office
30 East Braod Street, Room 1160
Columbus, OH 43215-3430

Project Location

Northwest Ohio Psychiatric Hospital
930 South Detroit Avenue
Toledo, Ohio 43614

Description

Interior and exterior masonry repairs consisting of installing masonry wall anchors, cutting in additional masonry expansion joints, tuck pointing work, replacement of damaged masonry units, sealing masonry penetrations, caulking work, painting of steel lintels, adding additional weep holes, replacement of damaged lintels, replacement of damaged insulation and replacement of damaged precast copings.

Contractor

General Trades
J&P Paving, Masonry and Sealing, Inc.
3858 Alum Creek Drive
Columbus, OH 43207

Direct Questions to Our Project Team

Project Manager: Kent Buehrer, AIA, LEED AP
Project Architect: Edward Glowacki, AIA, LEED AP
Structural Engineer: Husam Muhsen, PE, LEED AP
Construction Administrator: John Farley

Ashtabula VRP and Building Property Maintenance

Monday, September 20th, 2010

Owner

Ashtabula County JVS
1565 St. Rt. 167
Jefferson, OH 44047-9487

Contractors

General Contractor
Stitle Construction Company
819 Georgetown Road
PO Box 1177
Salem, OH 44460
330-332-9901- Phone
330-332-1478- Fax

Mechanical Contractor
York Mahoning Mechanical Inc.
724 Canfield Rd
PO Box 3077
Youngstown, OH 44511
330-788-7011- Phone
330-788-7513- Fax

Plumbing Contractor
The Conti Corporation
527 West Wood Street
Lowellville, OH 44436
330-536-6241 - Phone
330-536-8130 – Fax

Electrical Contractor
Becdel Controls Inc.
3229 Austintown Warren Road
Mineral Ridge, OH 44440
330-540-8613- Phone
330-544-2827- Fax

Direct Questions to Our Project Team
Project Architect: Brent Buehrer, AIA, LEED AP
Mechanical Engineer: Christopher Gaffney, PE, LEED AP
Electrical Engineer: Kent Buehrer, AIA, PE, F. NSPE, RCDD, LEED AP
Plumbing Designer: Brad Iott, LEED AP

Jefferson Area Local Schools Board Office

Monday, January 25th, 2010

Owner

Jefferson Area Local School District
45 E. Satin Street
Jefferson, OH 44047

Contractors

General Contractor
C. Tucker Cope & Associates, Inc.
Contact: Shawn Pruitt
170 Duquesne Street
Columbiana, OH 44408
330-482-4472

Electrical Contractor
RJ Martin Electrical Service, Inc.
Contact: Robin
22841 Aurora Road
Bedford Heights, OH 44146
216-662-7100

Mechanical Contractor
Contact: John Pugh
PO Box 912
Ashtabula, OH 44005
440-998-7252

Fire Protection Contractor
Brown Sprinkler Service, Inc.
Contact: Calvin Brown
2458 Rt 193
PO Box 8
Dorset, OH 44032
440-858-2753

Plumbing Contractor
Detrick Industrial Piping Co.
Contact: Greg Detrick
2312 Aetna Road
Ashtabula, OH 44004
440-992-7473

Direct Questions to Our Project Team

Project Architect: Brent Buehrer, AIA, LEED AP
Structural Engineer: Sam Muhsen, PE, LEED AP
Electrical Engineer: Kent Buehrer, AIA, PE, F. NSPE, RCDD, LEED AP
Mechanical Engineer: HVAC Chris Gaffney, PE, LEED AP
Plumbing Designer: Brad Iott, LEED AP

University of Toledo, Bowman Oddy Glass Lab

Wednesday, June 17th, 2009

University of Toledo, Powerhouse Siding Replacement

Wednesday, June 17th, 2009

University of Toledo, FSB Project

Wednesday, June 17th, 2009

Van Buren High School Addition & Renovation

Wednesday, June 17th, 2009

Addition consists of auditorium, music rooms, art room, science rooms, ag education lab, superintendent’s office, restroom, community room, elevator and gymnasium loft.

Completion Date — July 15, 2003

Wynford Elementary School

Wednesday, June 17th, 2009

Wynford Local School
New Elementary School, PK-6
3300 Holmes Center Road
Bucyrus, OH 44820

Steve Mohr, Superintendent
(419) 562-7828

Project Specifications

89,813 square feet
Construction cost — $6,622,000
Cost per square foot — $73.73
Total Cost — $7,250,000
Cost per square foot — $81.46

School Website Click Here

Occupied August, 2000

This project was completed in 24 months from passage of bond issue

Part of building designed for use of grades 7-8 after school hours

Assisting with OSFC Master Plan through ELPP

Western Reserve High School & Middle School

Wednesday, June 17th, 2009

Western Reserve Elementary School

Wednesday, June 17th, 2009

Western Reserve Local Schools
New Elementary

Don Barnes, Superintendent
(419) 660-8508

Project Specifications

Total Project Cost — $11,380,335
Completed — August 2002
Total Square Feet — 92,458
Square Foot Per Student — 115.6

School Website Click Here

The character of the sixth grade science lab reflects the age of the students without giving an institutional look.

The project was designed so that $750,000 of the original budget could be applied to needs in the high school additions and renovations that the OSFC did not cover in their initial assessment.

The dual platform between the cafetorium and the gymnasium allows maximum flexibility for numerous school functions