Toledo, Ohio
This project began with the investigation of the existing paving to determine what cause of action should take place. The Owner desired to create bioswales in lieu of traditional drainage techniques. All of the existing asphalt paving was replaced along with an existing water service line.
Completion Date: Summer 2011
























































































