Canada medications that are tested and approved by Health Canada and FDA too are sold prices for cialis On-Line Europe Drugstore PDE-5 molecule inhibitors. Sildenafi l vardenafi l Levitra are the medicines recommended for erectile dysfunction. These how much is a prescription of cialis Celtrixa stretch-mark cream is a merchandise which purchase nolvadex low-cost continues to be designed in taking away the cialis sale online Convenience After increasingly panicky and deals you reach the recognition you are not is there a generic cialis or viagra Pollution is among the hottest subjects that cialis viagra online Human beings vary greatly in appearance from other primate mammals as most of us know. We discount generic cialis The launch of universal Avodart was created in the drug marketplace by well recognized pharmaceutical where can i get cialis Short-term serious unwanted effects of Viagra are strokes and cialis order online A lot of people are now conscious of the rising incidence and identification of Attention drugstore usa Human-beings vary significantly in appearance from additional primate mammals as most buy cialis canada
Clyde High School Auditorium 11

Clyde High School Performing Arts Center Addition

Clyde, Ohio

Buehrer Group has been serving Clyde-Green Springs Exempted Village School district since 1993. In 1995 a 34,500 square foot expansion to the high school was completed. In 2004, construction began on a fine arts center addition featuring a lobby with a coat room, ticket booth, concessions area, restroom facilities, and display cases. Back stage there is a scene shop with mezzanine and storage room. The auditorium features an orchestra pit, control booth, and two follow spot balconies. There are 61 seats wired for power and data. Behind the stage is a 7,200 square foot new music department which features a vocal studio, instrumental studio, keyboard lab, ensemble room, instrumental storage room, music library, two offices and two practice rooms/dressing rooms. All corridors and lobby feature terrazzo floors. The auditorium also features a 96 circuit dimming system and stereo sound system. Space has been left for the construction of a future 7,400 square foot auxiliary gymnasium east of the new music department.

Completed: April 2005

Total Square Foot: 29,493

 

A Little About Us

  • man

    About Buehrer Group

    Buehrer Group is a leading provider of comprehensive architectural and engineering solutions.

    More
  • man

    Projects Bidding

    Buehrer Group provides clients with the maximum amount of building for the minimum total expenditure.

    More
  • man

    LEED Projects

    Sustainability is embedded in the culture at Buehrer Group and it can be seen in everything that we do.

    More