Awarded LEED Gold Under the LEED for School Program!
Green Springs, Ohio
Construction is underway for the new Green Springs Elementary School designed for 532 K-5 students and include all of the school districts 4th and 5th grade students. The 4th and 5th grade classrooms will be on separate floors of the two story wing of the building while the K-3 classrooms will be in a separate single story wing. All of the shared spaces such as Student Dining,
Administrative Offices, Gym, Music and Media Center will be centered between the two classroom wings. The new building will be built on the same site as the current elementary school. Because of the limited size of the site the new building is going to be within 80 feet of the current building during construction while the current building is still in use. The existing building will be demolished to make room for the parking lot once the new school is complete.
Complation Date: August 2010
Square Footage: 65,921